SIDE POCKET


SIDE POCKET

A new road around the Sheraton Addis Hotel opens a quick detour across aesthetically pleasing scenery. A severe shortage of cement as the 12 operational factories meet less than half of the 36 million tons demanded has caused the delay of several road projects in the country. With only a few key projects in selected areas receiving priority, the inability to juggle contractual delays are leading to constant disputes between contractors and clients. A staggering 41pc of projects administered by the Ethiopian Roads Administration operated at less than half of the planned capacity, with 20pc lacking both planning and implementation.


In-Picture

CURVY CORRIDORS

Rows of metal cups offer liquid solace for mourners going to the cemetery around Yeka Michael Church. An eerie optical illusion occurs as the row of cups seem to curve alongside the winding road. Traditional drinks made of cereal variety (Rhamnus prinoides) and Gesho and fermented honey are often served as refreshments in Ethiopian ceremonies of celebration and mourning. While tea and water are also offered in metallic cups colloquially known as nickel, a cold offering during social occasions of...


In-Picture

SLEEK SLABS

A street food vendor around the Stadium area pockets his inventory on a cosy corner wall. The area is being renovated as the eponymous soccer field's protracted construction nears completion. Bicycles for rental, informal driving instructors and the make-shift tent shops synonymous with the area are being slowly removed.  The six-decade-old stadium has been under construction for five years due to changing contractors and skyrocketing input costs. Kejela Merdasa, the minister of Culture & S...


In-Picture

CERAMIC SILHOUETTES

A new statue with emblems of the African Union hoisted atop traditional Ethiopian warriors casts a towering shadow across city hall near the Adwa Zero Kilometer Museum. The gargantuan project, spanning 45,000sqm, has recently opened its doors to the public to significant fanfare. The 4.6 billion Br project is made of 11 blocks that have auditoriums that can house 4,000 people at a time, galleries, gyms and art installations. A connecting bridge to the Mayor's office located across the street has...


Back
WhatsApp
Telegram
Email