Wastewater is flooding this street in Piassa from construction work being carried out next to it as a result of flaws in the drainage system.
Wastewater is flooding this street in Piassa from construction work being carried out next to it as a result of flaws in the drainage system. The construction taking place is that of the Adwa Memorial Centre. With construction having began in 2019 with funding from the Addis Abeba City Administration, it will consist of a museum as well as leisure facilities.